- The steel beam across the back of the house will be 2.5m instead of 2.1m above the ground. More light more height!
- The steel arrives today [I hope!] Got our 7th skip so far too so much rubbish! And we are in filling the back with rubble too can you believe and we still have spare!
- This week the side wall where the fireplace was [old back lounge] will be coming down.
- The fireplace marble surround will be moved to the front lounge.
- The doorway for the bi-fold doors will possibly be wall at he side will
- Old kitchen floor - new Utility room will be dug up.
- Old kitchen door [now utility room will be blocked up with a recess for shelves on the study side.
Well got home yesterday and my key wouldn't work! But that will be sorted today hopefully the builders are not locking us out of our home!
Here is the progress apologies in advance I was lazy and took these with my iphone!!!;
This is the utility room floor, there is damp so it is being dug out deeper to damp coarse.
Original Victorian quarry tiles were found and I have saved 4 from the skip for some abstract art in the new interiors. The back of the tiles have lovely design which I will display but I need to buy some cleaning solution to take off the cement/concrete and get them looking lovely.
The floor had been covered over with screed and cement and our old Amtico floor tiles. Had no idea this was still here! As the floor is in a Victorian terrace the Victorian quarry tiles have been laid on a lime substrate without any damp proofing.
The fireplace marble surround has been removed! This wall will be coming down this week.
More updates later!